1 image

15 GPM Stand-Alone Clarifier
$15,000 (USD)
- Stock Number
- CL-015-001
15 GPM Stand-Alone Clarifier
Key Features:
Flow Rate: 15 gallons per minute (GPM)
Material: Co...
See details1 image

FP-100-1200-P: Filter Press 100 Cubic Feet 1200mm
- Stock Number
- 5125
- Dimensions (in.)
- 302 x 72 x 81
- No. of plates*
- 77
- Nominal capacity (ft³)
- 100
Model Code: [FP] Filter Press - [100] Capacity - [1200] Plate Size - [P] Line Option - [X] Constr...
See details1 image

FP-050-1000-P: Filter Press 50 Cubic Feet 1000mm CGR
- Stock Number
- 5139
- Nominal capacity (ft³)
- 50
- Filtration Area (ft²)
- 1036
- Plate Size (mm)
- 1000
Industrial Strength Filter Press
Enviro Solutions line of filter presses make sludge volume redu...
See details2 images

FT-020-HMP
- Stock Number
- FT-020-HMP
- Gpm
- 20, Depending on the solids being loaded
- Contaminants
- Heavy Metals Precipitation
- Settling area sqft
- 98 Sq Ft
ES 20 GPM Flow-Through Systems can offer you an estimated: 98 Sq Ft Settling Area
Enviro Soluti...
See details2 images

FT-040-HMP
- Stock Number
- FT-040-HMP
- Gpm
- 40, Depending on the solids being loaded
- Contaminants
- Heavy Metals Precipitation
- Settling area sqft
- 192 Sq Ft
ES 40 GPM Flow-Through Systems can offer you an estimated: 192 Sq Ft Settling Area
Enviro Soluti...
See details2 images

FT-100-HMP
- Stock Number
- FT-100-HMP
- Gpm
- 100, depending on solids loading
- Contaminants
- Heavy Metals Precipitation
- Settling area sqft
- 480 Sq Ft
ES 100 GPM Flow-Through Systems can offer you an estimated: 480 Sq Ft Settling Area
Enviro Solu...
See details2 images

FT-100-HMPCR
- Stock Number
- FT-100-HMPCR
- Gpm
- 100, depending on the solids being loaded
- Contaminants
- Heavy Metals Precipitation, Hexavalent Chrome Reduction
- Settling area sqft
- 480 Sq Ft
ES 100 GPM Flow-Through Systems can offer you an estimated: 480 Sq Ft Settling Area
Enviro Solut...
See details2 images

FT-080-HMPCR
- Stock Number
- FT-080-HMPCR
- Gpm
- 80, Depending on the solids being loaded
- Contaminants
- Heavy Metals Precipitation, Hexavalent Chrome Reduction
- Settling area sqft
- 384 Sq Ft
ES 80 GPM Flow-Through Systems can offer you an estimated: 384 Sq Ft Settling Area
Enviro Soluti...
See details2 images

FT-080-HMP
- Stock Number
- FT-080-HMP
- Gpm
- 80, Depending on the solids being loaded
- Contaminants
- Heavy Metals Precipitation
- Settling area sqft
- 384 Sq Ft
ES 80 GPM Flow-Through Systems can offer you an estimated: 384 Sq Ft Settling Area
Enviro Solut...
See details1 image

FT-060-HMPCR
- Stock Number
- FT-060-HMPCR
- Gpm
- 60, Depending on the solids being loaded
- Contaminants
- Heavy Metals Precipitation, Hexavalent Chrome Reduction
- Settling area sqft
- 288 Sq Ft
ES 60 GPM Flow-Through Systems can offer you an estimated: 288 Sq Ft Settling Area
Enviro Soluti...
See details2 images

FT-060-HMP
- Stock Number
- FT-060-HMP
- Gpm
- 60, Depending on the solids being loaded
- Contaminants
- Heavy Metals Precipitation
- Settling area sqft
- 288 Sq Ft
ES 60 GPM Flow-Through Systems can offer you an estimated: 288 Sq Ft Settling Area
Enviro Solut...
See details2 images

FT-040-HMPCR
- Stock Number
- FT-040-HMPCR
- Gpm
- 40, Depending on the solids being loaded
- Contaminants
- Heavy Metals Precipitation, Hexavalent Chrome Reduction
- Settling area sqft
- 192 Sq Ft
ES 40 GPM Flow-Through Systems can offer you an estimated: 192 Sq Ft Settling Area
Enviro Soluti...
See details